AKPINAR

Infrastructure / Completed Projects / Zamantı Regulator and Diversion Tunnel

Work completion date
:
10/07/2011
Employer
:
General Directorate of State Hydraulic Works
Location of project
:
Kayseri, Turkey
Tunnel length
:
10.700 m
Tunnel Excavation Dia.
:
5,28 m
Quantity of tunnel ex.
:
288.006 m3
Irrigation canal
:
20 km
Method of Construction
:
Manufactures of 10,700 meter-long tunnel was performed from input and output port portal without ventilation shaft and approach tunnel tunnel and the approach tunnel. From each tunnel portal 5,350 meters long  tunnel manufacture and ventilation was established. In this regard, it is Turkey's longest tunnel that the ventilation was performed from the tunnel portal. Tunnel excavation manufacturing was made ​​by the drilling-blasting method, support has been provided by spray concrete, wire mesh, rock bolts and retaining, tunnel isolation have been provided by injection after the tunnel covering has been constructed by reinforced concrete.

ÜNAL AKPINAR İnşaat Sanayi Turizm Madencilik ve Ticaret A.Ş. Güneş Sokak No:31 Kavaklıdere 06690, Ankara, T: (312) 468 79 60 (4 Hat), F: (312) 468 93 41, info@ua.com.tr
İşbu sitenin tüm hakları saklıdır. Web sitesi içerisindeki dökümanlar ve resimler kaynak gösterilse dahi, izin alınmadan başka web sitelerine, ticari yayınlara aktarılamaz, kopyalanamaz. © 2013